Collection: EPR Spain
Spain requires a separate registration for electrical equipment, batteries and packaging. Manufacturers without a branch need an authorised representative on site; that role is performed for us by a partner company. Registration requires a Hague apostille – that fee is already included in our packages.
- Electrical equipment (WEEE), categories 1–6 – 6–8 weeks, annual report; on first registration one category and three brands are included
- Electrical equipment (WEEE), category 7 – photovoltaic modules – separate package with 40 t of recycling costs included
- Batteries – 6–8 weeks, quarterly reports
- Packaging – at least 3 months, annual report; requires a Spanish tax number (NIF)
The separate category for photovoltaic modules is a Spanish peculiarity: anyone supplying modules to Spain registers not under the general equipment categories but under category 7.
Allow sufficient lead time – packaging registration in Spain takes considerably longer than in Germany, and it cannot start without a NIF.
-
Packaging – Spain
Regular price €400,00 EURRegular priceSale price €400,00 EUR -
Batteries – Spain
Regular price €550,00 EURRegular priceSale price €550,00 EUR -
Photovoltaic Modules (WEEE Cat. 7) – Spain
Regular price €900,00 EURRegular priceSale price €900,00 EUR -
Electrical Equipment (WEEE) Cat. 1–6 – Spain
Regular price €500,00 EURRegular priceSale price €500,00 EUR